Why composite works
Lay one plank on top of another and load them: each bends on its own, and the two surfaces slide past each other at the joint. Glue them together and they bend as one deeper member. Because bending stiffness grows with the cube of the depth, the glued pair is four times as stiff and twice as strong as the loose pair.
A floor of a steel beam and a concrete slab works the same way. Without a connection the slab simply sits on the beam. With one, the slab carries the compression and the steel carries the tension, each doing what it does best: concrete is cheap and good in compression, steel is excellent in tension.
Shear connectors
The glue is a row of headed studs welded to the top flange and cast into the slab. They must transfer the horizontal shear between slab and beam: between a support (zero moment) and mid-span (maximum moment), the slab force grows from zero to its full value, and the studs in that length carry all of it.
- Full shear connection: enough studs to develop the full plastic moment. The number between zero and maximum moment is the smaller of the slab and steel forces divided by the resistance of one stud.
- Partial shear connection: fewer studs, some slip, a lower moment resistance. Often economic, within the code's minimum degree of connection.
A stud fails either by shearing its own shank or by crushing the concrete around it, so its resistance is the smaller of the two (Eurocode 4 form, before the partial factor):
\[P = \min\left(0.8 f_u \frac{\pi d^2}{4},\; 0.29\, d^2 \sqrt{f_{ck} E_{cm}}\right)\]Effective width
The slab does not stress evenly across its width: compression has to spread out from the beam through the slab, so parts far from the beam lag behind (shear lag). Design uses an effective width working at full stress instead. Eurocode 4 takes about \(L_e/8\) on each side of the beam, where \(L_e\) is the distance between points of zero moment, but never more than the real slab available:
\[b_{\text{eff}} = 2 \times \min\left(\frac{L_e}{8},\; \frac{\text{beam spacing}}{2}\right)\]Plastic moment
At failure the concrete in compression is taken at \(0.85 f_{ck}\) and the steel at \(f_y\), and the neutral axis sits where the forces balance. If the slab can take more compression than the steel can give in tension, the neutral axis lies in the slab at a depth
\[x = \frac{A_a f_y}{0.85 f_{ck}\, b_{\text{eff}}}\]and the lever arm runs from the middle of the steel section to the middle of that concrete block:
\[M_{pl} = A_a f_y \left(\frac{h_a}{2} + h_c - \frac{x}{2}\right)\]If the slab is weaker, the neutral axis drops into the steel and part of the steel works in compression; the same idea applies with one more force to balance.
Worked example
Composite floor beam, 9 m span
IPE 360 in S355 (\(A_a = 72.7\ \text{cm}^2\), \(h_a = 360\ \text{mm}\), \(W_{pl} = 1019\ \text{cm}^3\)), beams 3 m apart, 120 mm solid slab in C25/30. Characteristic values, no partial factors, to show the effect.
\[\begin{aligned} b_{\text{eff}} &= 2 \times \min(9/8,\; 3/2) = 2.25\ \text{m} \\ N_c &= 0.85 \times 25 \times 2250 \times 120 = 5738\ \text{kN} \\ N_a &= 7270 \times 355 = 2581\ \text{kN} < N_c \;\Rightarrow\; \text{neutral axis in the slab} \\ x &= \frac{2581\,000}{0.85 \times 25 \times 2250} = 54\ \text{mm} \\ M_{pl} &= 2581 \times (0.180 + 0.120 - 0.027) = 705\ \text{kN}\cdot\text{m} \end{aligned}\]The bare steel beam has \(M_{pl,a} = 1019 \times 355 = 362\ \text{kN}\cdot\text{m}\). The slab, already there to carry the floor, almost doubles the moment resistance.
Studs: 19 mm diameter, \(f_u = 450\ \text{MPa}\), \(E_{cm} = 31\ \text{GPa}\):
\[\begin{aligned} P &= \min(0.8 \times 450 \times 283.5,\; 0.29 \times 19^2 \sqrt{25 \times 31\,000}) = \min(102,\; 92) = 92\ \text{kN} \\ n &= \frac{2581}{92} = 28\ \text{studs from each support to mid-span} \end{aligned}\]That is 56 studs on the beam, about one every 160 mm.
Propped or unpropped
Composite action only starts once the concrete has hardened. Before that, someone has to carry the wet concrete:
- Unpropped: the steel beam alone carries its own weight, the deck and the wet slab. Check it as a bare steel beam, usually with lateral-torsional buckling restrained only by the deck. Later loads go onto the composite section.
- Propped: temporary props carry the wet slab; when they are removed, the whole load goes onto the composite section. Less steel, but more site work.
Composite beams are usually controlled by deflection and vibration, not strength, because they are so strong for their depth. For deflection, the slab is converted into an equivalent area of steel using the modular ratio \(E_a/E_c\), with a larger ratio for long-term loads because concrete creeps.